Industry: Commercial
Based in an area of outstanding natural beauty, the pipeline carries water from Coedty reservoir the Dolgarrog hydro electric power station.
Haltec provided the following services to complete the project:
- Working with the contractor to replace the existing over-ground supply pipe with underground supply pipe